Import machine times

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Import machine timesRoles: AdministratorPermission: equipment:write

The machine times import sets from a CSV file how long a machine takes for its work: its time per batch or its rate per hour, with its setup, efficiency and batch sizes. A row whose machine, product and variant match a machine time updates it, and any other row adds one.

On the Equipment screen, open Actions on the Machines tab and click Import machine times…. How a CSV import works explains the dialog, the file and its formats.

  • productSku alone: the product’s time on the machine, which its variants share.
  • productSku and variantSku: that variant’s own time on the machine. The variant must be one of the product’s.
  • Neither: the machine’s default time, which lets it run every product of its machine type.

A row gives a time per batch (processingTimeMinutes) or a rate per hour (throughputPerHour), never both. It replaces the time the machine had, whichever kind that was. An empty setup, efficiency, batch size or unit keeps what the machine time had. The rules are those of the machine’s page: a smallest batch above the largest, or a unit the time can’t be converted in, is refused when the row is written.

unitNumber names a machine by its unit number, and the SKUs a product and a variant, each exactly. Import the machines, products and variants first.

ColumnFormatWhat it holdsExample
unitNumberRequiredImport keyTextThe unit number of the machine the time is forOV-01
productSkuImport keyTextThe SKU of the product the time is for; with variantSku also empty, the row is the machine's default time, which lets it run every product of its typeBREAD
variantSkuImport keyTextThe SKU of one of the product's variants, for that variant's own time; when empty, the time is the product's, which its variants shareBREAD-500
processingTimeMinutesWhole numberThe minutes a batch takes, whatever its size; give this or throughputPerHour, not both45
throughputPerHourDecimalThe units the machine makes in an hour, so a batch takes as long as its size needs; give this or processingTimeMinutes, not both120
uomCodeTextThe physical unit the throughput and batch sizes are in, such as kg; when empty, the variant's packaging base unit. A product's time takes nonekg
setupMinutesWhole numberThe setup: the minutes the machine needs before its first work of the product in a plan; a new time needs none when empty10
efficiencyWhole numberThe machine's efficiency for the product, in percent from 1 to 100; a new time is 100 when empty85
minBatchDecimalThe smallest batch the machine runs; a new time has no minimum when empty20
maxBatchDecimalThe largest batch the machine runs; a new time has no maximum when empty200
  • A unitNumber that matches no machine: a machine without a unit number can’t be found by an import, so give it one on its page first.
  • A variantSku without its productSku, or one that isn’t a variant of that product.
  • The same machine time twice in the file.
  • A row with neither a time per batch nor a rate per hour, or with both.
  • An efficiency outside 1 to 100.