Skip to content

Stock

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Open this screenRoles: Administrator, EmployeePermission: inventory:read
  • Open an item's stock page and its movementsRoles: Administrator, EmployeePermission: inventory:read
  • Receive, issue, adjust or transfer stock, move it between bins, and set default binsRoles: AdministratorPermission: inventory:write
  • Import opening stock, or recalculate ABCRoles: AdministratorPermission: inventory:write
  • Print labelsRoles: Administrator, EmployeePermission: inventory:read

The Stock screen shows, for each item you keep, what you have, what is spoken for and what is on its way, and the figure those add up to. It is also where you move stock by hand: receive it, issue it, correct it and move it within a site.

The screen lists an item once it has stock, an open order or requirement, or a reorder level or safety stock. Every figure is worked out from the stock movements, orders and requirements behind it, in the item’s stock unit, so it is never out of step.

Four cards above the list each open a dialog:

  • Receive stock: book materials that arrived without a purchase order into a location, with their lot or serial numbers. To receive against a purchase order, receive it on the order instead: see Receive a delivery against a purchase order.
  • Issue stock: take materials out of stock by hand when they are used outside a production order. Only free stock can be taken, never stock reserved for an order. An item not tracked by lot leaves your default location.
  • Adjust stock: correct stock on hand after a count, damage or loss. See Correct stock on hand.
  • Transfer stock: move one item’s stock to another location at once. See Move stock within a site.

Each posts a stock movement the moment you save it, which the Transactions screen lists, and the list reloads.

The Stock screen of the bakery: the four cards Receive stock, Issue stock, Adjust stock and Transfer stock, the ABC line with Recalculate ABC, and the items as cards, each with its status, on hand, committed, expected and calculated stock.

Figure What it counts
On hand Stock you can use: in your own active locations, in a lot that can be used, less units numbered by serial number that are quarantined. Stock at a contractor’s, in an inactive location or on the road is left out
Committed What is owed out of stock: what remains of the material requirements of production orders past their draft, less what their sub-assembly orders make, and what confirmed sales orders still have to deliver
Expected What is on its way: what is outstanding on placed purchase orders with an expected day, the whole quantity of open production orders that aren’t sub-assembly orders until their output is received, and stock on the road between your sites
Calculated On hand less Committed plus Expected less Safety stock. Shown in the warning colour when it is below zero
Value and Avg cost On hand valued at each location’s running average cost, and the average it gives. — when nothing is costed; a value that covers only part of the stock says how much isn’t costed
ABC and 12-mo consumption Purchased items classed A, B or C by what was issued of them in the last 12 months, valued: the items that make up the first 80 % of the value are A, the next 15 % B, the rest C. Unclassified when some of it has no known cost; — for an item not classed

Reserving stock for a production order changes none of these: Committed counts an order’s demand whether or not it is reserved. Where an item’s stock sits, and how much of it is reserved, is on its page and on Balances.

The line above the list says when the ABC classes were last worked out and how many items are in each. werkplan works them out each night; Recalculate ABC does it at once.

The list shows each item’s Item, SKU, Source (bought or made), Status, the figures above, its Reorder level and Safety stock. Show it as Cards or as a Table, search it, sort it and filter it by most of its columns. On a row, Movements opens the Transactions screen narrowed to that item.

Actions holds:

  • Print labels: an A4 sheet of 24 barcode labels for the items you pick, each with the item’s name, its barcode or SKU and, if you give one, a lot. Stock doesn’t change.
  • Import opening stock…: the stock you have when you start with werkplan, from a CSV file. See Opening stock.
  • An export of the list as a CSV file.

Click an item to open its stock page: where it sits, and what its figures are made of.

  • The strip: its On hand, Committed, Expected and Calculated.
  • Position: the figures again, On hand linked to the item’s movements, Expected with how much of it is in transit, its Safety stock and Reorder level, and when it Runs out, with, once a run-out is projected, when to Order by and the Suggested order, from the same projection as What runs out next.
  • By location and lot: each of its balances, with what is Available, on hand and reserved, its lot and bin. Stock that can’t be used reads not usable. A row with a lot opens the lot.
  • Default bins: for each location, the bin a delivery of this item is put away in unless the receipt says otherwise. Pick one to change it.
  • Projected stock: how its stock moves day by day with what is committed and expected.

Actions holds Bin transfer, which moves its stock from one bin to another in one location: see Move stock within a site.

Still stuck? Write to support@example.com.