Skip to content

Operator

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Sign in at a terminal with a name and a PINRoles: Administrator, Shop floor terminal, Warehouse terminalPermission: shopfloor:operate
  • Start, report and finish jobs at a shop-floor terminalRoles: Administrator, Shop floor terminalPermission: shopfloor:jobs
  • Receive and pick at a warehouse terminalRoles: Administrator, Warehouse terminalPermission: shopfloor:receive or shopfloor:pick
  • Add an operator and give them a PINRoles: AdministratorPermission: operator:write

An operator does the work on the floor and records it at a shop-floor terminal: starts a job, reports progress and scrap, reports a problem, and finishes the job.

An operator has no user account and holds no role. They sign in at the terminal by tapping their name and typing their 4-digit PIN; the terminal has signed in to werkplan with an account of its own, which holds the Shop floor terminal role, or Warehouse terminal at goods-in. The PIN says who stands at the terminal, so the work recorded there carries their name.

An administrator, or a shift supervisor given a role that allows it, adds each one on the Operators screen with their PIN. See Operator.

  1. On the shop floor: every shift, at the terminal.
  2. When something happens: report a machine down or back, or units that fail inspection, at the terminal as soon as it happens.

Print them and hang them beside the terminal:

Jobs on a shop-floor terminal; Receive and Pick on a warehouse terminal.

Still stuck? Write to support@example.com.