Report progress at the terminal

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Start, pause, resume, give a part done and finish a job, beside shopfloor:operateRoles: Administrator, Shop floor terminalPermission: shopfloor:jobs

Start a job when the work starts, and finish it with the good units when the batch is done. werkplan records who did what, and when.

  1. Tap your name and type your PIN.
  2. Tap Jobs at the top, if the terminal shows it. Tap your machine to see its jobs alone.
  3. Tap Start when the work starts.
  4. Stopping part-way, for a break or the end of the shift: tap Pause. Tap Resume to carry on.
  5. Handing a running batch to the next shift: tap Part done, give the good units so far, and tap Save and keep going.
  6. When the batch is done: tap Finish, check How many did you make?, and tap Finish.
  7. Units lost: give them as scrap when you finish. See the card Report scrap at the terminal.
  8. Leaving the terminal: tap your name, then Sign out.
  • That PIN was not recognised. Try again.: type it again. After five wrong PINs, ask your supervisor for another PIN.
  • Machine down · wait for the new plan: Start is off until the planner promotes a new plan.
  • Your job isn’t listed: the step before it isn’t finished, or it starts after tomorrow at this time. Ask your supervisor.
  • A message at the top: read it. The list is read again.
  • A machine stops, or units fail inspection: tap Report a problem.

Read this page online at docs.werkplan.app/how-to/start-and-finish-a-job-at-the-terminal/

Still stuck? Write to support@example.com.