Skip to content

Working-time rules

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Edit the labour rulesRoles: AdministratorPermission: organization:write
  • Save a shift past a floor with the emergency overrideRoles: AdministratorPermission: workforce:admin

werkplan checks every shift against the working-time limits your organisation sets in its labour rules, on the Company shift policy screen. It checks the limits you set, not your country’s law: this page says what werkplan checks, what it leaves to you, and, for Germany and North Macedonia, how their law maps onto it.

werkplan checks working-time rules as your organisation’s labour rules describe them. It doesn’t give legal advice, and it doesn’t make a schedule comply with any law. You choose labour rules that match the laws and collective agreements you work under, and you are responsible for following them. Laws and agreements change, and werkplan’s rules don’t follow them by themselves.

werkplan doesn’t choose the rules by country

Section titled “werkplan doesn’t choose the rules by country”

Every organisation starts with the same labour rules, whatever its country:

  • at least 11 hours’ rest between two shifts;
  • at most 10 hours of working time in a shift;
  • at most 48 hours a week on average over 17 weeks;
  • at most 6 working days in a row;
  • at least 35 hours of weekly rest in every 7 days;
  • a night from 22:00 to 06:00: a shift with 3 hours of working time in it is a night shift;
  • breaks count as working time.

Every other limit is off until you set it. Set each rule to the value your law and agreements give: Edit labour rules on the Company shift policy screen. Most of its sections end with How countries set this, examples of how some countries set its rules.

  • The workforce solve plans within every limit. It never plans past one, not even where an authorisation or a consent would let a shift through.
  • A shift you place by hand, a swap, and a coverage gap you fill are checked before werkplan saves them. The dialog shows each limit a shift breaks; past a limit, werkplan refuses the shift, or asks for an overtime authorisation (below).
  • An overtime request past a floor is refused when it is made.
  • An absence you record is refused when the shifts it leaves would break a limit, such as a run of night shifts, unless an authorisation covers it or a workforce admin uses the emergency override.
  • A rotation is activated only when it meets every rule (see Rotation).
  • A shift type that breaks a rule can be saved, but each of its shifts then breaks that rule (see Shift types).
  • Publishing the workforce schedule checks no working-time rule.

A rule you switch on, or tighten, leaves the shifts saved before it in place. The workforce schedule marks some of them, such as a shift that breaks a restriction or holiday rest, not every one.

Each limit is a floor or authorisable, as Authorisation and consent in Edit labour rules sets it:

  • Authorisable: a shift past the limit passes with an overtime authorisation that covers it, or an approved overtime request.
  • Floor: a shift past the limit is refused, whoever authorises it. Only the emergency override passes it, which needs the permission workforce:admin; the workforce schedule marks the shift.

By default, the average weekly hours and a shift type’s shortened full time are floors, and the other limits you set are authorisable. Some are always floors: the rest minimums and the compensatory rest they owe, the free weekday owed for a Sunday or holiday worked, the break rules, an employee’s restrictions, and a young worker’s limits. An employee’s own holiday is always authorisable.

Two things nothing passes, not even the emergency override: a shift starting on a public holiday your plant closes on, and, with Holiday rest on, a shift with working time in a closed holiday’s 24 hours. Two shifts of one employee never overlap.

An employee’s signed consent raises one limit for them, up to the ceiling you allow, or lifts one of their restrictions, without an authorisation. By default no limit can be raised by consent.

Section of Edit labour rules What werkplan checks
Daily limits The rest between two shifts, also within the 24 hours from each shift’s start. The working time in a day, counted per shift or in the 24 hours from a shift’s start. The rest owed after a long day. The shortest shift. Extended days over a normal working day.
Weekly limits The average weekly hours over a reference period of 17, 26 or 52 weeks. A weekly hour cap. The working days in a row. The working time of a sixth working day in a week. Short weeks: a full-timer’s planned short week is flagged and never refused, and a rotation with a short week can’t be activated.
Weekly rest and Sundays The weekly rest in every 7 days, or over a period of 2 or 3 weeks. A Sunday off at least once in so many weeks. Holiday rest. The fewest free Sundays a year. A free weekday owed near each Sunday, or public holiday on a weekday, worked.
Breaks Whether a break counts as working time. The break a shift needs for its working time, and where the break sits.
Shortened rest A lower rest minimum in the cases your law allows, and the compensatory rest it owes.
Recorded periods Named date ranges, such as a season, in which a shortened minimum or a weekly rest period applies.
Redistribution periods Contracted hours averaged over a period, with a weekly and a daily cap of their own.
Schedule notice How far ahead a published shift can change without a reason, and the shortest notice.
Overtime Overtime caps a week, a month, a year and on average. Reminders that the labour inspection must be told.
Night work The night, and how much working time in it makes a night shift. The most night shifts in a run. A night worker’s average, hazardous night work and the longest night shift.
Young workers Stricter limits for an employee before their 18th birthday, read from the date of birth, and a night of their own.
Protected statuses What each protected status, such as pregnancy, bars, its own limits, and the breastfeeding pause noted on her shifts.
Authorisation and consent Which limits are floors, and how far a consent may raise each.

Each employee adds their own: a weekly hour cap, contracted hours, restrictions, protected statuses and consents (see Employee). Each shift type can hold a shortened full time, and a night shift type can be marked hazardous.

What werkplan leaves to you, in every country

Section titled “What werkplan leaves to you, in every country”

werkplan doesn’t check:

  • what your law says about pay, premiums, holiday entitlement and contracts;
  • whether your law lets you work a public holiday: you mark a holiday calendar Worked only where it does;
  • hours an employee works for another employer, and time spent in training or at school;
  • the limits for children under 15: werkplan reads one age, 18;
  • drivers’ and other mobile workers’ rules;
  • more than one break in a shift: a shift type holds one break;
  • that you told the labour inspection, which werkplan only reminds you of, and the papers behind a consent, whose reference werkplan records and never checks;
  • the breastfeeding pause: werkplan notes it on her shifts and plans whole shifts.

A shift counts by its clock times, so on the night the clocks change it counts an hour more or less than it lasts.

This guide describes the law of two countries, Germany and North Macedonia. For each, werkplan checks names the settings of Edit labour rules, and the employee and shift type records, that hold a rule of that law once you set them to its values. Left to your company names what werkplan doesn’t check, or checks only in part. Other countries set their limits on Edit labour rules too, and this guide doesn’t describe their law.

werkplan checks, once your labour rules hold your law’s values: Min rest between shifts, max daily hours, daily limit counts, average weekly hours with its reference period, min weekly rest, weekly rest period, Sunday rest, holiday rest, fewest free Sundays a year, replacement rest day, breaks count as working time, break tiers, break placement, shortened rest, compensatory rest, night, night work, young workers, protected statuses, restrictions, consents.

Under Authorisation and consent, the law makes max daily hours, a night worker’s average and the fewest free Sundays a year floors. The metal industry’s collective agreement adds the shortest shift, full time, redistribution periods and overtime caps.

Left to your company:

  • Which holidays an exception lets you work (mark their calendar Worked).
  • A Sunday or holiday starting before midnight, and the replacement rest day joined to the daily rest.
  • Young workers’ 10-hour span, holidays, and 24 and 31 December.
  • Hours for other employers, and longer days for standby work.
  • Under the metal agreement: a part-timer’s day worked in one stretch, overtime counted by the day or in a time account, and work ending at 12:00 on 24 and 31 December.

werkplan checks, once your labour rules hold your law’s values: Min rest between shifts, max daily hours, shortest shift, weekly hour cap, fewest working days a week, min weekly rest, weekly rest period, Sunday rest, breaks count as working time, break tiers, break placement, redistribution periods, overtime caps, night, night work, young workers, protected statuses, restrictions, consents, shortened full time, hazardous night work.

Under Authorisation and consent, the law makes hazardous night work a floor.

Left to your company:

  • Daily and weekly rest averaged in shift work under a collective agreement.
  • The night-worker test, and the 7 hours’ rest between 22:00 and 05:00 owed to women in industry and construction.
  • Reduced working capacity, which only the employee’s own weekly hour cap holds.
  • Young workers under 15.

Still stuck? Write to support@example.com.