Exception

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • See what is open on the Report pageRoles: Administrator, Shift supervisorPermission: exception:report or planning:execute
  • Report a machine down or back or a QA rejection on the Report page, and withdraw one reported thereRoles: Administrator, Shift supervisorPermission: exception:report
  • Report or withdraw an absence on the Report page, beside exception:reportRoles: Administrator, Shift supervisorPermission: schedule:write
  • See the open exceptions on the Master plan screen, be told of each one, and open the re-planRoles: AdministratorPermission: planning:execute
  • Report or withdraw a rush order, a quantity changed or an order on holdRoles: AdministratorPermission: order:write
  • Report or withdraw late materialRoles: AdministratorPermission: purchasing:write
  • Withdraw a machine down saved on the machine's pageRoles: AdministratorPermission: equipment:write
  • Withdraw an absence saved on the employee's pageRoles: AdministratorPermission: employee:write

An exception is something the master plan didn’t expect: an absence, a machine down, a rush order, late material, a QA rejection or scrap, or an order’s quantity changed, put on hold or cancelled. It is saved the moment it is reported, whoever reports it and wherever, and stays open until a promoted master plan takes it in.

You don’t create an exception. You save its record, and werkplan opens the exception beside it when the save touches work, a shift or an order the master plan in force holds. Every screen that saves the record counts: the Report page, a shop-floor terminal, the machine’s or the employee’s page, the production order’s page, the purchase order’s page, a sales order’s change to its production orders, and a CSV import.

Kind Opened when
Machine down A machine’s unavailable time is saved, moved or made longer over work still to do that the master plan holds on it
Machine back An unavailable time ends earlier, and the master plan holds work on the machine that the freed time could run
Absent An absence is saved over work the master plan names the employee on, or takes away a published shift that hasn’t ended
QA rejection Units of the master plan’s work fail inspection
Scrap A task of the master plan completes with units scrapped
Rush order An order is made rush while the master plan holds work it goes ahead of
Quantity changed An order’s lines are resized or added, on the Report page, by its sales order or by an import, while the master plan holds its work
On hold, Cancelled An order is put on hold or cancelled while the master plan holds its work
Late material A purchase order’s expected date moves later, so an order’s material comes after its work in the master plan starts

With no master plan in force, nothing is an exception. A save of another kind, such as a routing or a calendar, never is: it is a change the master plan’s Show changes lists. A record with an open exception of its kind opens no second one: that one follows the record. A save that changes several orders, such as an import, opens one exception naming them all.

Every planner, everyone with planning:execute, is told of each exception as it opens, in werkplan’s notifications: “Oven 2 reported down by …”, with who reported it, never an absence’s reason. A machine back is told as reported back.

When the end an unavailable time or an absence was saved with is only assumed, and it passes while still assumed, every planner is told once to extend it or report it back.

  • Master plan, for a planner: while any exception is open, the band Open exceptions takes the place of the card of changes. Its head says where the re-plan is: Re-plan ready with when it was solved, how many operations moved and how many orders become late, Re-planning…, Re-plan failed, or Re-plan not solved yet, with Open re-plan, or Re-plan while none is open. A row for each exception follows, oldest first. Under them, Also N other changes since the master plan counts the changes that are no exception’s, with Show changes.
  • The top bar: the count of open exceptions, linking to the Master plan screen.
  • The Report page: Open now lists them, and Your reports today lists your own, in any state.

The band is shown in When something happens.

Each row shows the kind, what it is about and its details, such as Breakdown · since 06:12 · assumed until end of shift (14:00), who reported it, when and where, and its state.

stateDiagram-v2
  accTitle: Exception statuses
  accDescr: An exception opens when its record is saved. Promote of a master plan that took it in closes it; Withdraw takes it back while it is open.
  [*] --> Open: Its record is saved
  Open --> Closed: Promote takes it in
  Open --> Withdrawn: Withdraw
Status How it gets it How it leaves it Elsewhere
Open Its record is saved over the master plan’s work Promote takes it in, or Withdraw The re-plan solves around it; planners are told
Closed Promote of a master plan that took it in Never Its record is corrected like any record
Withdrawn Withdraw Never What it took away is put back

The re-plan hasn’t been promoted with it yet. The open re-plan solves again each time an exception opens, is withdrawn or is reported back, and is created by the first one. While it is open, the row says where the re-plan has got to:

  • Re-planning…: the open re-plan is solving.
  • In the re-plan: the re-plan’s last solve took it in.
  • Needs a decision: a scrap the re-plan hasn’t decided: Make again or Deliver short. See Decide what happens to scrap.
  • Open: none of these.

A machine reported down, or a person reported absent, can’t be reported again on the Report page while the first report lasts.

A master plan that took it in was promoted: the plan in force holds it. Promote closes each open exception reported before the re-plan’s data was read; one reported after that stays open for the next re-plan. A scrap nobody decided stays open until its order completes or is cancelled. A closed exception can’t be withdrawn: correct its record on its own page instead.

Someone took it back while it was open, and the row says who and when. The open re-plan solves again without it. See Withdraw.

Withdraw takes back a report made by mistake while it is open. It is on each row of the band, of Open now and of Your reports today, wherever you may undo it. werkplan asks you first, saying what goes, and then puts back what the exception took away:

  • a machine down: its unavailable time is deleted;
  • an absence: it is deleted, and each shift it took away is put back where it still fits, not one someone covered in the meantime nor one another shift, absence or working-time rule leaves no room for; werkplan says which;
  • a QA rejection: it is cancelled, with its extra work;
  • a rush order: the order gets back the priority it had;
  • a quantity changed: the lines get back the quantities they had;
  • an order on hold: it is resumed;
  • late material: the delivery goes back to the date it was expected before.

A cancel, a machine back and scrap can’t be withdrawn. Neither can a QA rejection its extra work resolved, a rush order no longer rush or created rush, an order no longer on hold, a quantity changed once its order has started, nor a machine down or an absence another exception names too. An absence changed on the employee’s page after the Report page saved it needs employee:write to withdraw.

Withdrawing needs the right to save the record:

Exception Needs
A machine down exception:report when reported on the Report page, equipment:write when saved on the machine’s page, either one from a terminal
A QA rejection exception:report when reported on the Report page, schedule:write when recorded on a task’s page, either one from a terminal
An absence exception:report and schedule:write while it stands as the Report page saved it; employee:write otherwise
A rush order, a quantity changed, an order on hold order:write
Late material purchasing:write

Still stuck? Write to support@example.com.