Pick an order at the terminal
- Available on
- Trial
- Pro
- Enterprise
- Who can do this
- Start, confirm, finish or give up a pick list, beside shopfloor:operateRoles: Administrator, Warehouse terminal
Permission: shopfloor:pick
- Start, confirm, finish or give up a pick list, beside shopfloor:operateRoles: Administrator, Warehouse terminal
Pick the orders that are due first. Finishing a pick list takes the goods out of stock and delivers the order.
- Tap your name and type your PIN.
- Tap Pick at the top, if the terminal shows it.
- Tap Start picking on the order due first, or Continue on one already started.
- Walk the locations in the order shown. At each line, take what Take says, from the lot and bin it names.
- Give the quantity you took, or scan each unit’s serial number. A number you type takes Add.
- Tap Confirm. Took less than planned? Confirm what you took: the line reads SHORT, or EMPTY for none.
- A wrong count: tap Change on the line.
- When every line is confirmed: tap Finish, read what it ships, and tap Finish again.
- Order shipped: note the delivery’s number on the paperwork.
If it goes wrong
Section titled “If it goes wrong”- Finish stays off: the bar names the line not confirmed.
- The order was not shipped: nothing has left stock. Check the list and try again.
- You have to stop: tap Give up, then Give the list up. Nothing has left the shelf.
Read this page online at docs.werkplan.app/how-to/pick-an-order-at-the-terminal/
Still stuck? Write to support@example.com.