Skip to content

Deliver a sales order

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Deliver a sales orderRoles: AdministratorPermission: inventory:write
  • Print its delivery noteRoles: Administrator, EmployeePermission: order:read

You deliver a confirmed sales order from its page when the goods are ready to go. The goods leave stock at once, and production not yet started for the delivered lines shrinks to what they still owe.

  1. Open the sales order from the Sales orders screen.
  2. Click Deliver. Deliver sales order opens with a card for each line still owed, with what it still owes and the rows werkplan proposes to take it from, as a pick list would.
  3. Check each row: Ship from, the location, bin and lot it leaves from, and the Quantity. Change either, remove a row with the cross beside it, or click Split to take a line from one more place. A row at 0 ships nothing, so to deliver part of the sales order, lower the rows.
  4. For a serial-tracked item, enter the Serial numbers, one per line; left empty, the oldest units at that location and lot go.
  5. Click Deliver.

werkplan reads the sales order again first: if what it owes changed after the dialog opened, it ships nothing and says so. A row with a quantity must name where it ships from, and the rows naming one place can’t take more than it holds. A line shipping more than it owes is warned about, and still ships; the delivery notes the extra.

A line with Nothing of this item is on any shelf. can’t be delivered yet: wait for its production order or its purchase, or deliver the other lines.

After the delivery, the sales order’s Lines show what was Delivered and is still Owed, its delivery status moves to Partly delivered or Delivered, and Deliveries lists the shipment. Click Delivery note on its row to print the note for the driver.

If the warehouse picks at the terminal, start a pick list with Create pick list instead: finishing it there delivers what was picked. See Pick list.

See Delivery.

Still stuck? Write to support@example.com.