Report scrap at the terminal
- Available on
- Trial
- Pro
- Enterprise
- Who can do this
- Finish a job with its scrap, beside shopfloor:operateRoles: Administrator, Shop floor terminal
Permission: shopfloor:jobs
- Finish a job with its scrap, beside shopfloor:operateRoles: Administrator, Shop floor terminal
Units lost at your step are scrap. Give them when you finish the job, with why they were lost. The planner is told, and decides whether they are made again.
- Tap your name and type your PIN.
- On Jobs, tap Finish on your running job.
- Under How many did you make?, give the good units only.
- How many were scrapped? starts at the units short. Lower it if some are still to make: those stay planned.
- Under Why?, tap Material, Machine, Operator, Setup or Other.
- For Other, type What was it?
- Tap Finish.
Scrap can’t be withdrawn: count before you tap.
If it goes wrong
Section titled “If it goes wrong”- Finish stays off: tap a reason under Why?, and for Other type what it was.
- That is more than twice the planned …: check the count. Finish anyway records it.
- Units that fail inspection are not scrap: tap Report a problem, then QA rejection.
- A wrong count is recorded: tell your supervisor. A finished job can’t be opened again here.
Read this page online at docs.werkplan.app/how-to/scrap-at-the-terminal/
Still stuck? Write to support@example.com.