Add a machine
- Available on
- Trialup to 25 machines
- Proup to 150 machines
- Enterprise
- Who can do this
- Add a machine and give it its capacities, changeovers and trainingRoles: Administrator
Permission: equipment:write
- Add a machine and give it its capacities, changeovers and trainingRoles: Administrator
A machine runs the routing steps of its equipment type. werkplan plans work on it only once it has a capacity for the item, its own or a default one; this page takes you there.
Before you start
Section titled “Before you start”- Its equipment type exists on the Types tab of the Equipment screen, or you add it on the spot with the + beside the field.
- To give it a capacity for a product, the product is active.
- To say who may run it, the training exists on the Training screen.
Add the machine
Section titled “Add the machine”- On the Equipment screen, on the Machines tab, click New machine.
- Enter a Name, such as Oven 2. It heads the machine’s section on the printed dispatch list.
- Enter a Unit number that no other machine has, such as OVN-02. An import of machines updates the machine with the same unit number.
- Choose its Equipment type. The machine runs the routing steps that need this type.
- Leave Status at Operational.
- Click Create machine, then open the machine’s page.
Give it a capacity
Section titled “Give it a capacity”Under Default capacity, click Set default capacity. The default is how the machine runs every product without a capacity of its own here.
- Choose the Processing time: Time per batch, the same minutes at any size, or Rate per hour, units made in an hour.
- Enter Setup (before the first work): the minutes before its first work in a production schedule.
- Enter its Efficiency (%). At 80 %, each batch takes 1.25 times as long. Leave it at 100 for a machine that runs at its full speed.
- If it takes only certain batch sizes, enter its Minimum batch and Maximum batch.
- Click Save.
Where the machine runs one product differently, click Add capacity under Capacities, choose the Product and, if you like, one Variant, and enter the same figures for it. A routing step with a time of its own uses that time instead, stretched by the machine’s efficiency.
Say what it takes to switch and to run it
Section titled “Say what it takes to switch and to run it”- Changeovers: Edit at the top sets the machine’s own figure, the minutes between any two items without their own. Add changeover gives one switch, from one product or variant to another, its own minutes, such as a cleandown.
- Training: Add requirement names a Training the people running the machine need, and how many Employees with it each operation needs at once.
Add its planned maintenance
Section titled “Add its planned maintenance”Under Unavailable time, click Add period for each planned stop, such as maintenance, with its Start and End, and click Add time. No work is placed inside it.
What changes
Section titled “What changes”Scenarios and re-plans made from then on plan work on the machine. The master plan stays as it is until you promote one of them; meanwhile, Show changes on the Master plan screen lists the machine as New machine with its equipment type.
If something goes wrong
Section titled “If something goes wrong”- werkplan says the limit is reached: your subscription tier’s cap on machines is reached, and Upgrade opens your subscription. Decommissioned machines count too.
- An order is left out with No machine can run it: no machine of the step’s type has a capacity for the item. Give one a default capacity, or a capacity for the product.
- An order is left out with Not enough trained employees: there are never as many employees with the machine’s training at once as an operation needs. Train more, or put more of them on one shift.
What comes next
Section titled “What comes next”Give each product a routing whose steps run on the machine’s equipment type: Give a product its routing. The machine’s own page explains each panel and its statuses: Machine.
Still stuck? Write to support@example.com.