Move stock to another site
- Available on
- Trial
- Pro
- Enterprise
- Who can do this
- Raise, ship, receive or cancel a transferRoles: Administrator
Permission: inventory:write - Print the transfer noteRoles: Administrator, Employee
Permission: inventory:read
- Raise, ship, receive or cancel a transferRoles: Administrator
You move stock between two of your own sites with a transfer: draft it, ship it when the goods leave, and receive it when they arrive. Between the two, the goods are on the road: counted as expected, but on hand nowhere.
- On the Transfers screen, click New transfer.
- Pick where the goods leave under From and where they arrive under To. If you like, enter the Expected arrival and Notes, and click Create draft.
- On Lines, click Add line. Pick the Item; for an item tracked by lot, pick the lot at the source. Enter the Quantity and click Add line. Repeat for each item.
- When the goods leave, click Ship and confirm. The stock leaves the source at once, and the transfer is In transit.
- In Actions, click Print for the transfer note that travels with the goods.
- When they arrive, open the transfer and click Receive, and confirm. Everything that shipped is on hand at the destination, not in a bin, and the transfer is Received.
werkplan refuses Ship when the source doesn’t hold enough of a line in stock that can be used, or when any of a line’s stock at the source, in its lot, is reserved for a production order: release the reservation on its material requirement first. Nothing moves until the whole transfer can ship.
If the truck is late, change the Expected arrival with Edit in Actions. If the goods never leave, Cancel transfer brings them back to the source; it asks for the reason once the transfer has shipped. If less arrives than shipped, receive the transfer, then write off the shortfall at the destination: see Correct stock on hand.
To put the goods away onto shelves at the destination, use Bin transfer: see Move stock within a site.
See Transfer.
Still stuck? Write to support@example.com.