Move stock within a site
- Available on
- Trial
- Pro
- Enterprise
- Who can do this
- Transfer stock, or move it between binsRoles: Administrator
Permission: inventory:write
- Transfer stock, or move it between binsRoles: Administrator
You move stock within a site in one step: Transfer stock moves it to another location, and Bin transfer moves it onto another shelf of the same location. Both book a transfer movement at once. For stock that travels between sites, use a transfer instead: see Move stock to another site.
To another location
Section titled “To another location”- On the Stock screen, click Transfer stock.
- Pick the Material. For an item tracked by lot, pick the Lot / source bucket: the lot, location and bin it leaves from, with its free stock. Otherwise pick the From location.
- Pick the To location, enter the Quantity, and if you like Notes.
- Click Transfer.
The stock leaves the source at once and arrives at the destination in the same lot, not in a bin. An item not tracked by lot leaves from its stock not in a bin first, then bin by bin; a lot leaves the bin you picked. Only free stock moves: werkplan refuses the move while any of the stock it would draw on, in that lot, is reserved for a production order. Release the reservation first.
Onto another shelf
Section titled “Onto another shelf”- On the Stock screen, click the item to open its stock page.
- In Actions, click Bin transfer.
- Pick the Location, and for an item tracked by lot the Lot.
- Pick the bin it leaves From, or none for stock not put away yet, and the bin it goes To, an active bin of that location.
- Enter the Quantity and click Move.
On hand at the location stays the same; only the bin changes. You can move up to what the source bin holds free: reserved stock stays where it is.
Neither move can be voided. To undo one, move the stock back the same way.
Still stuck? Write to support@example.com.