Import routings

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Import routingsRoles: AdministratorPermission: product:write

The routings import adds and updates your products’ production routings from a CSV file, one row per step: the step’s name, the machine type it runs on and its time. The rows of one product are its routing, checked and written together; a row whose step number the routing has updates that step, and any other row adds one.

On the Products screen, open Actions and click Import routings…. The dialog is Import routing steps from CSV. How a CSV import works explains the dialog, the file and its formats.

  • The product has no production routing: the rows make one, named after the product and active, with their steps.
  • It has one: a row whose stepNumber the routing has updates that step, as saving the step on the routing’s page does; any other row adds a step. The routing keeps its name and status.

Every routing’s steps run from 1 with no gap, in any order of rows. A re-import never removes a step: a routing that has steps after the file’s last is refused whole, naming them, so you remove them on its page first or add them to the file.

The step’s time. A step takes its time per batch (processingTimeMinutes) or its rate per hour (throughputPerHour), not both. A row giving one replaces the other, as choosing Time per batch or Rate per hour on the step does; a row giving neither keeps the step’s time, and a step added without one takes the machine’s.

Import the products and the machine types first: machineType names a machine type by its exact name. Rework routings have no import; add them on the product’s page.

ColumnFormatWhat it holdsExample
productSkuRequiredImport keyGroups rowsTextThe SKU of the product whose production routing the step is in; the rows sharing it are the steps of one routingBRD-RYE
stepNumberRequiredImport keyWhole numberThe step's place in the routing: a routing's steps run 1 to n with no gap, and a re-import updates the step with this number2
stepNameRequiredTextThe step's nameBake
machineTypeRequiredTextThe name of the machine type whose machines run the stepOven
descriptionTextWhat the step doesBake at 230 °C
bufferMinutesAfterWhole numberMinutes to wait after the step before the next one starts, such as cooling; a new step waits none when empty30
allowPauseAfterYes or noWhether work may pause after the step; a new step allows it when emptyyes
onePersonFromStartToFinishYes or noWhether one person does each of the step's operations from start to finish, a one-person step; a new step is not one when emptyno
processingTimeMinutesWhole numberThe step's own time per batch, in minutes. A step takes it or throughputPerHour, not both, and giving one replaces the other; with neither the step keeps its time, and a new step takes the machine's45
throughputPerHourDecimalThe step's own rate per hour, in units of the item's base unit. A step takes it or processingTimeMinutes, not both, and giving one replaces the other120
  • The same step number twice for one product, and steps with a gap.
  • A machineType that matches no machine type.
  • A row with both a time per batch and a rate per hour.
  • One invalid row of a product: the product’s other rows wait for it, so its routing is written whole or not at all.

A variant whose steps differ from its product’s routing has its own steps refreshed, as editing the routing on its page does. Scenarios and re-plans made after the import plan with the routings it wrote; the master plan stays as it is until you promote one of them.