Set up a shop-floor terminal
- Available on
- Trial
- Pro
- Enterprise
- Who can do this
- Invite the terminal's account and give it its roleRoles: Administrator
Permission: user:write - Add the operatorsRoles: Administrator
Permission: operator:write
- Invite the terminal's account and give it its roleRoles: Administrator
A shop-floor terminal is a tablet or screen on the floor or at the dock that signs in to werkplan with an account of its own, as a device, and stays signed in across shifts. The people who work at it sign in on top of it with their name and PIN. Set one up in five steps.
1. Invite an account for the device
Section titled “1. Invite an account for the device”On Access, click Invite user. Give an Email someone at the plant reads, as the invitation sets the device’s password, and name the device in First name and Last name, such as Terminal and Line 1.
2. Give it a terminal role
Section titled “2. Give it a terminal role”Open the user, and under Roles click Manage. Give it a terminal role in place of Employee:
| Role | The terminal offers |
|---|---|
| Shop floor terminal | Jobs, and Report a problem |
| Warehouse terminal | Receive and Pick, as two tabs under the header Shop floor |
A device that does both gets both roles, and a tab for each screen. A device whose roles offer one screen alone shows no tabs, and its header names the screen: Shop floor for Jobs, Goods in for Receive or Picking for Pick. A terminal role lets the device stay signed in through a shift. When werkplan says terminal sign-in isn’t set up, ask your werkplan contact.
3. Choose the machines it serves
Section titled “3. Choose the machines it serves”On the same user’s page, under Terminal machines, click Choose machines and pick the machines at this terminal. Its job list then holds only their work, with a chip for each machine when there is more than one. Leave it empty on a plant with one terminal: a terminal bound to no machine lists every machine’s work.
4. Sign the device in
Section titled “4. Sign the device in”On the device, follow the invitation and set the password. Then open your werkplan address ending in /shop-floor, and sign in with the device’s account. The terminal opens on its first screen and asks Who is on this machine?
5. Add the operators
Section titled “5. Add the operators”On the Operators screen, add each person who works at the terminal with their own PIN. They appear on every terminal’s sign-in list at once.
Then print the terminal cards and hang them beside the device:
Still stuck? Write to support@example.com.