Skip to content

Receive goods at the terminal

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Receive a delivery, beside shopfloor:operateRoles: Administrator, Warehouse terminalPermission: shopfloor:receive

When a delivery arrives, book it against its purchase order. werkplan puts the goods into stock and counts them on the order.

  1. Tap your name and type your PIN.
  2. Tap Receive at the top, if the terminal shows it.
  3. Tap the order the delivery is for. Check the supplier and the order number against the delivery note.
  4. For each line that arrived, set the quantity that arrived with − and +.
  5. Kept by lot: type or scan the Lot number, and the expiry if there is one.
  6. Then scan the item or tap the line, so it reads CONFIRMED.
  7. Pick the bin under Put away into, and the location under Into which location?
  8. Type the number of the Supplier’s delivery note.
  9. Tap the button that counts your lines, such as Receive 3 lines.
  10. Write the receipt’s number from Delivery recorded on the delivery note.
  • A line won’t confirm: the line says what it needs. Receive it from the office.: take it to the office.
  • The delivery was not recorded: nothing is booked. Check what you entered and tap again.
  • The order isn’t listed: it isn’t placed, or it has arrived already. Ask the buyer.
  • A receipt was booked wrong: the office voids it.

Read this page online at docs.werkplan.app/how-to/receive-goods-at-the-terminal/

Still stuck? Write to support@example.com.