Put an order on hold

Available on
  • Trial
  • Pro
  • Enterprise
Who can do this
  • Put an order on hold and resume itRoles: AdministratorPermission: order:write

You put a production order on hold from its page to stop it for a while: plans leave it out and the shop floor can’t work on it. Resume puts it back in line.

  1. Open the order from the Production orders screen. An order can go on hold while it is Pending, Scheduled or In Progress.
  2. Open Actions and click Put on hold. The order is On Hold.

While it is on hold:

  • its running operations are paused, and the shop floor can’t start its work;
  • scenarios and re-plans leave it out;
  • its reserved material stays reserved;
  • its sub-assembly orders aren’t held: put each on hold too if it should stop.

If the master plan in force holds its work, the hold is reported as an exception: the open re-plan takes it in, and the hold reaches the master plan when you promote the re-plan.

To go on, open the order and click Resume. It is In Progress if it had started, otherwise Pending, and the next plan plans it again. Operations that were paused stay paused until someone resumes them on the shop floor.

See Production order.