Cancel a production order
- Available on
- Trial
- Pro
- Enterprise
- Who can do this
- Cancel a production orderRoles: Administrator
Permission: order:write - Delete a draft insteadRoles: Administrator
Permission: order:delete
- Cancel a production orderRoles: Administrator
You cancel a production order from its page when it is no longer needed. Cancelling ends its work and releases its reserved material, and it can’t be undone: the order stays on record as Cancelled.
- Open the order from the Production orders screen.
- Open Actions and click Cancel order.
- The dialog lists the material its first step used, which is issued from stock, and says the rest of its reserved material is released. Click Cancel order, or Keep order to leave it.
Cancelling also cancels its work in the master plan, running work too, and its open QA rejections. If the master plan in force holds its work, the cancel is reported as an exception for the re-plan.
To cancel several orders at once, select them on the Production orders screen and click Cancel selected.
A draft that was never submitted can be deleted instead: Actions › Delete removes it and leaves no record. An order that has been submitted can’t be deleted. A sub-assembly order its parent still needs can’t be cancelled on its own: cancel the parent. Cancelling a parent cancels its sub-assembly orders that haven’t started and lie outside the frozen horizon; the others stay, flagged as no longer needed.
See Production order.
Still stuck? Write to support@example.com.